Education

Requiring special consideration for safety, noise reduction and minimisation of disruption to students and staff, the education sector has its own particular challenges. Togel’s projects include creating inspiring learning environments through new builds, refurbishments and extensions within schools, colleges and universities.

St Bede's Presbytery_

This was a two phase contract carried out over a period of twenty weeks. Phase 1 comprised of internal structural works and demolition to form a new bathroom, a sitting room and a bedroom with an e-suite. Works also included an upgraded heating system with new boiler to serve the house. Phase 2 required the demolition of an existing garage and out-building, and excavation works. We utilised our in-house team of bricklayers for the construction of a new-build garage and a new external store. The presbytery resides within a conservation area, all stonework was sourced locally to ensure compliance with the local area and existing buildings. All external joinery was manufactured within our joiners shop. Both church and presbytery were occupied whilst works were carried out, our professional team of operatives ensured minimal disruption.

Client_

Diocese of Hallam

Project Details_

New Build Garage & Store

Project Duration_

15 weeks

Project Value_

160k

Northern Racing College_

Design & Build of a new Visitor Centre, together with associated parking. This unique build consisted of a traditionally built ground floor with cedar cladding, and a timber frame first floor with trespa cladding. Works included reception, two exhibition rooms, catering/cafeteria and conference facilities. Unprecedented chaotic weather caused mass flooding in the region, but the project was still completed on budget and on time. Northern Racing College_Northern Racing College_Northern Racing College_Northern Racing College_

Client_

Northern Racing College

Project Details_

New Visitor Centre

Project Duration_

16 weeks

Project Value_

654k

St Catherine's Church_

This 23 week contract included extensive work, both internally and externally, to the church. External works included new flat and pitched roof coverings, lightning protection, new bespoke timber framed double glazed windows, refurbishment of the stained glass windows, re-pointing works and external decorations. Internal works included full re-plastering, new heating system to incorporate underfloor heating, new fully programmed scene-set lighting and full internal decorations. St CatherineSt CatherineSt CatherineSt Catherine

Client_

Diocese of Hallam

Project Details_

Church Refurbishment

Project Duration_

20 Weeks

Project Value_

560k

RC Primary School_

New build of a traditional construction, consisting of dinning room, full catering kitchen, toilets and undercover walk-way link to existing. This contract was completed on time and on budget. RC Primary School_RC Primary School_RC Primary School_RC Primary School_RC Primary School_RC Primary School_

Client_

St Mary’s RC Primary School

Project Details_

New Build Kitchen/Dining Room Extension

Project Duration_

7 Weeks

Project Value_

560k

Sportique, Elveden_
££120,000

Shell extension and refurbishment work to form a new retail unit, including structural elements, suspended ceilings, vinyl flooring, decorating and sh...

READ MORE_

New Training Facility_
£1.35m

Design & Build of new training facilities, offices, classrooms and garage workshop. This build consisted of a steel frame, complete with mezzanine le...

READ MORE_

Cape Bar_
£215k

Existing two storey public house, re-branded with high quality finishes, manufactured and sourced in-house. This project was completed on time and to ...

READ MORE_

DRI Childrens Ward_
££1,800,000

This project consisted of strip out of the former women's ward, alterations & refurbishment to form a new Children's ward. The ward included assessmen...

READ MORE_