Our particular expertise in the leisure sector has involved us in developments throughout the UK, including pubs, restaurants and hotels. Togel understand how important it is in the leisure world to open to the public as soon as possible. For this reason, our service is geared towards working quickly, unobtrusively and to a high standard. This allows day-to-day business to continue with minimal inconvenience.
Cape Bar_
Existing two storey public house, re-branded with high quality finishes, manufactured and sourced in-house. This project was completed on time and to budget. As this project was so successful the client went on to further negotiate with ourselves two new Cape Bars and six further re-brands in London inner-city.
![]()
![]()
![]()
Client_
Barracuda GroupProject Details_
RefurbishmentProject Duration_
8 WeeksProject Value_
215kThistle Hotel_
Complete refurbishment to one floor comprising eighteen bedrooms and en-suites. Also we fully refurbished five function rooms, two bars and bar areas. The gymnasium was also refurbished with new decorations, new floor coverings, and new music and conference data systems. The hotel was fully operational during all works.
![]()
![]()
![]()
![]()
![]()
![]()
![]()
Client_
Curzon HotelsProject Details_
Bedrooms & Function RoomProject Duration_
7 weeksProject Value_
255kBottle & Glass PH_
Virtual new build of a former Listed public house within a conservation area following extreme fire damage. The new public house was constructed using traditional methods under close guidance of the local conservation officer. The main body of the building was constructed using Whitchert walling, finished with a thatched roof, horse hair lime plaster and lime render. The public house included a new bar, catering kitchen and manager's accommodation above. The carpark was fully resurfaced and the building lit externally, the windows were manufactured to suit the original design in-house.
Client_
Greene KingProject Details_
New Build of listed buildingProject Duration_
30 WeeksProject Value_
600kDoncaster Trades & Conference Centre_
Fit out of four floors contained within the Frenchgate Shopping Centre to provide reception facilities, games room and bar, concert room and bar, lounge bar, and conference and office facilities. Installation of catering kitchen, two passenger lifts, and all fittings and furnishings. All bespoke joinery was completed in our own joiners shop. Access and unloading was severely restricted due to the location of the project in the middle of a busy operational shopping centre and the works being spread over four floors. The project was successfully completed within the 20 week period and to budget.
![]()
![]()
![]()
![]()
Client_
Doncaster Trades & Labour Club LtdProject Details_
Fit OutProject Duration_
20 weeksProject Value_
1.45mJ D Wetherspoon_
Full conversion and extension of a Grade II former Methodist Church (circa 1840) to form a new Public House with fully serviced ground and first floor trading areas. Located off the narrow High Street of the town centre, servicing the site proved challenging with only one access point being a steep incline from the one way street to the front boundary. Bespoke quality joinery fitted throughout including a new feature staircase, all manufactured in-house. A first floor extension was constructed to the rear of the property to form a commercial kitchen and staff facilities. External works included the formation of a forty metre long service ramp cut into the incline of the land, with retaining walls constructed in stonework and granite copings all of which were sourced locally to match the original building.
![]()
![]()
![]()
![]()